PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Job site Facing South (800x600).jpg Excavation along G-K and Line 5 Facing East (800x600).jpg Excavation along G-K and Line 5 Facing North (800x600).jpg Pouring concrete at Elev. 1,2,3 Shear wall Facing South-East.jpg Placing Rebar at wall forms at M 5-6 and L 3.3-5 Facing South-East (800x600).jpg Placing Rebar at wall forms at M 5-6 Facing South-East (800x600).jpg Tying the rebar mats at Elev. 5-6 Facing West (800x600).jpg Pouring concrete at Elev. 1,2,3 Facing South (800x600).jpg Tying rebar Mats at Elev. 5-6 Facing South-West (800x600).jpg
Previous pageNext page Placing Rebar at wall forms at M 5-6 and L 3.3-5 Facing South-East (800x600)
Placing Rebar at wall forms at M 5-6 and L 3.3-5 Facing South-East (800x600)